Search

Active search icon

Search

Displaying results 1 - 10 of 246

for keyword
Filter By

Sort by

Filter Results

  • All
  • Business
  • Residential
  • Outages

Up to 30kW

Last modified: 19 November 2016

This page is for you if you are an Installer, Solar Retailer or Registered Electrical Contractor (REC) and you are designing a solar and/or battery system that is up to 5kW total inverter capacity per phase or up to 3.5kW total inverter capacity per phase for SWER. Get instant pre-approval for free using our online solar capacity calculator.

Pre-approval Tool Welcome

Last modified: 19 November 2016

This page is for you if you are an Installer, Solar Retailer or Registered Electrical Contractor (REC) and you want pre-approval for your customer’s solar and/or battery system that is up to 10kW total inverter capacity per phase and 5kW (3.5kW for SWER) total export limit per phase.

Terms Conditions

Last modified: 19 November 2016

Request Assessment

Last modified: 19 November 2016

This page is for you if you are an Installer, Solar Retailer or Registered Electrical Contractor (REC) and you want to request pre-approval for your customer’s solar and/or battery system for systems greater than 30kW capacity and 15kW export.

How to request Insurance Letter

Last modified: 19 November 2016

If this is a page, you can write page description here. This will be used for Search.

If no Page Description, DELETE this entry before publishing.

How to lodge your Claim

Last modified: 19 November 2016

If this is a page, you can write page description here. This will be used for Search.

If no Page Description, DELETE this entry before publishing.

Stc

Last modified: 19 November 2016

Murra Warra Wind Farm

Last modified: 19 November 2016

About the Murra Warra Wind Farm project: AusNet Services is constructing a new transmission connection for Stage 1 of the Murra Warra Wind Farm project, located approximately 30km north of Horsham in north western Victoria.

Salt Creek Wind Farm

Last modified: 19 November 2016

About the Salt Creek Wind Farm project: AusNet Services has completed a new transmission line for the 54 MW Salt Creek Wind Farm project in western Victoria. The transmission line connects the wind farm to the Terang Terminal Station via 50.5km of 66kV powerline.

Bulgana Wind Farm

Last modified: 19 November 2016

About the Bulgana Wind Farm project: AusNet Services is constructing the transmission connection for the 204 MW ‘Bulgana Green Power Hub’ located near Stawell in the Wimmera region of central western Victoria. The transmission connection will include a transmission line and a terminal station linking in to AusNet Services’ Victorian transmission network.

No results found. Please modify your search.